Control On; Control Off; Figure 7-15. Vout_A Start-Up From Control, 35-Acc Load; Figure 7-16. Vout_B Start-Up From Control, 35-Acc Load - Texas Instruments TPSM8D6C24EVM-2V0 User Manual

Table of Contents

Advertisement

Performance Data and Typical Characteristic Curves

7.7 Control On

Figure 7-15
and
Figure 7-16
Figure 7-15. VOUT_A Start-Up From Control, 35-A
CC Load

7.8 Control Off

Figure 7-17
and
Figure 7-18
Figure 7-17. VOUT_A Shutdown From Control, 35-
A CC Load
14
TPSM8D6C24EVM-2V0 User's Guide
illustrate the start-up from control on waveforms at 35-A outputs.
illustrate the control off waveforms at 35-A outputs.
Copyright © 2021 Texas Instruments Incorporated
Figure 7-16. VOUT_B Start-Up From Control, 35-A
CC Load
Figure 7-18. VOUT_B Shutdown From Control, 35-
A CC Load
www.ti.com
SLUUCK6 – DECEMBER 2021
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPSM8D6C24EVM-2V0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents