Final Checks - Kodak Multiloader 700 Side-by-Side Kit Installation Instructions Manual

Table of Contents

Advertisement

FINAL CHECKS

1
.
Press the SERVICE BUTTON while the permanent magnets still override the SBS
INTERLOCK SYSTEM. The SBS performs now a reset and the CARRIAGE should move
from the PROCESSOR to the ML700 and back. This test ensures that the SERVICE
BUTTON works correctly, for it has to be used by the customer in case of a problem.
The CARRIAGE must be on the PROCESSOR SIDE during STANDBY
2
.
Take out the permanent magnets and put the SBS-COVER and the ADAPTER-
COVER in place.
3
.
Mount all PANELS.
4
.
Load the magazines with fresh films.
5
.
Run several cycles and check the processed films to see if the system is light-tight.
6
.
If a DFT is installed, feed several unexposed films through the DFT and check the
processed films to see if the system is light tight.
Light tightness of the DFT is critical. If it is not sealed correctly with foam rubber, fogged films will be the
result. Not only FILMS from the DFT may then be fogged, but also FILMS from the ML700 too.
KODAK AG, Stuttgart
SERVICE BUTTON
ADAPTER
PROCESSOR
figure 11-5
NOTE
11-5
II 3066-2
10/98

Advertisement

Table of Contents
loading

Table of Contents