Appendix
A.2 "Commissioning" checklist for SIMOCRANE CenSOR
A.2
"Commissioning" checklist for SIMOCRANE CenSOR
Work through the following steps to ensure successful commissioning of SIMOCRANE CenSOR:
Chapter
What needs to be done?
Installation/connec‐
SIMOCRANE CenSOR components: Unpack, install and connect → Select version
tion (Page 35)
→ Indoor crane version selected
→ Outdoor crane version selected
Set up the interface (applies to both versions)
→ Establish the preconditions
→ Establish the connection to the SIMOCRANE CenSOR MV540 H camera and start the user interface
150
•
Install the camera housing on the trolley
of the indoor crane
•
Install the reflector on the load suspension
device of the indoor crane
•
Connect components on the indoor crane
•
Install the camera housing on the trolley
of the outdoor crane
•
Install the reflector on the load suspension
device of the outdoor crane
•
Connect components on the outdoor
crane
Check that the preconditions are fulfilled
Install PRONETA on the PC/programming de‐
vice
•
Connect the SIMOCRANE CenSOR MV540
camera and the PC using an Ethernet cable
•
Switch on the SIMOCRANE Cen‐
SOR MV540 camera
•
Configure the Ethernet connection be‐
tween the camera and PC (Page 49)
•
Set the lighting parameters (Page 55)
•
Start Web Based Management (WBM)
(Page 49)
•
Calibrate the SIMATIC MV540 H CRANES
camera via the user interface
OK?
SIMOCRANE CenSOR
Operating Instructions, 07/2021