Siemens SIMATIC NET S7-300 Manual page 80

Cps for industrial ethernet
Hide thumbs Also See for SIMATIC NET S7-300:
Table of Contents

Advertisement

3 Operating the Ethernet CP with
Procedure
To enter a substitute object in the project, following the steps below:
1. Select the project in the SIMATIC Manager.
2. Select Insert
Other Station, PG/PC or SIMATIC S5
Possible result: the selected object is created in the project.
Figure 3-5
Project With Substitute Objects Configured
Attaching Non-S7 Stations to the Subnet
The next step is to assign the substitute objects to the subnet, as follows:
1. Select the required object in the project and select
Edit
Object Properties.
"
2. In the Properties dialog box that is displayed select the "Interfaces" tab and
click the "New" button (for example "Other Station".
Result: The New Interface - Type Selection dialog box is displayed.
A -80
Station
and then as necessary
"
"
S7-CPs for Industrial Ethernet Configuring and Commissioning
Release 01/2007
C79000-G8976-C182-07

Advertisement

Table of Contents
loading

Table of Contents