Substitute Objects" In The Step 7 Project - Siemens SIMATIC NET S7-300 Manual

Cps for industrial ethernet
Hide thumbs Also See for SIMATIC NET S7-300:
Table of Contents

Advertisement

3.3.5

"Substitute Objects" in the STEP 7 Project

Overview
Communication connections can be configured fully when the communications
partners are available in the current project. For the stations on the Ethernet
subnet, whose configuration data were not created in STEP 7 or whose
configuration data are not managed in the currently active project, the following
substitute objects can be created in the project:
S SIMATIC S5 stations
S PG/PC
S Other stations
- for devices of other manufacturers
- for SIMATIC S7 stations in another project (not necessary in a multiproject)
Note
Instead of creating substitute objects, you can also configure unspecified
connections for connections to the stations listed above.
In the Properties dialog of these connections, you must then specify the full
partner address. These partners do not appear in the NetPro plant view.
Plant
"Production 1"
S7-400/1
Ethernet subnet (1)
S7-400/3
S7-CPs for Industrial Ethernet Configuring and Commissioning
Release 01/2007
C79000-G8976-C182-07
S7-400/2
3 Operating the Ethernet CP with
Plant
"Production 2"
PC/PG
Third-party
device
S7-400/5
SIMATIC S5
S7-400/4
A -79

Advertisement

Table of Contents
loading

Table of Contents