6.1 Frequent Inspections (At the beginning of each shift
during which a crane is used)
•
At system power up, check if all alarm lights are on, buzzer sounds and
lockout are activated.
•
Verify that the system has been properly configured.
•
Verify the accuracy of the clock.
•
Verify that no error has been detected by the system.
•
Verify the weight of the hook block (must be consistent with last check).
•
Verify the radius according to the boom selection. The displayed radius
must be between 0 and 10% greater than the actual radius or in
accordance with current regulations.
•
Verify that the capacity displayed conforms to the capacity chart of the
crane manufacturer.
•
Verify the functionality of the ATB if fitted.
Warning! Any deficiencies shall be examined and a decision
must be made as to whether they constitute a hazard before
using the machine.
6.2 Periodical inspections (every 6 months)
Inspect at regular intervals the following:
•
All cables for cuts or damage as well as all connectors for corroded contacts.
•
The attachment of the cable reel at the end of the boom.
•
The plunger of the ATB switch for excessive corrosion.
•
Excessive wear of brushes in the reeling drum.
•
Evidence of leakage at the pressure transducer connection.
•
Functionality of the bridging device.
•
Operation of the lockout relays.
Telescopic Cranes Pressure Sensing
Inspection, Testing & Maintenance