Td24Psu Test Procedure; Step 2 - Optex Fiber SenSys Terrain Defender TD 100 Installation Manual

Table of Contents

Advertisement

TD24PSU Test Procedure

Step 1
With the DP4 ON/OFF switch in the off position, engage the previously tested AC input
and then measure and verify the AC voltage is 120 – 240 VAC and that the AC power
LED on the LPS5 is illuminated.

Step 2

Verify DC power LED is illuminated on the LPS5 and verify the LPS5 DC output is 24
VDC.
Page 59
Figure 71. AC power testing points (red arrow)
Confidential – Limited Distribution

Advertisement

Table of Contents
loading

Table of Contents