TD48PSU Test Procedure
Step 1
With all pivoting fuse holders disconnected and circuit breaker off, engage AC input
power.
Measure and verify the AC voltage is 120 – 240 VAC and that the AC LED is illuminated.
Page 66
Figure 77. Test probe in terminal block test port
Figure 78. AC power testing points (red arrow)
Confidential – Limited Distribution