Download Print this page

APRILIA RSV4 1100 Factory Service Station Manual page 369

Hide thumbs Also See for RSV4 1100 Factory:

Advertisement

RSV4 1100 Factory
ling on the connecting rod head must
face outward of its crank pin.
Specific tooling
020856Y Piston assembly ring
Remember to couple the connecting
rod shank and cap correctly, combin-
ing the respective numerical referen-
ces.
Use new connecting rod screws, lubri-
cating the thread and under the head..
Proceed with tightening according to
the procedure described in the tighten-
ing torque table using the torque
wrench and angular tightening with a
goniometer.
Crankcase closing
Insert the crankshaft together with con-
necting rods and pistons in the upper
crankcase.
Position the three centring dowels in
the crankcase.
Insert a new oil seal O ring in the spe-
cific seat.
Engine
ENG - 369

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Tuono v4 1100 rr factory 2019