Mechanical installation

2.1.1 Order and arrangement

The following basic guidelines apply to the arrangement and installation of the supply unit and servo
amplifiers:
Line-up and order
The devices can be mounted directly next to each other and without any gaps between them. They
ƒ
are fastened with two/four screws to the mounting plate. Control and power voltages are supplied to
the servo amplifiers (JM-3000) via DC link and 24 VDC busbars. With the same cooling concept, this
is possible without additional compensation measures with regard to device depth.
The units must be mounted in the specified order in a row as shown in Fig. 2.1. A different order is not
ƒ
permissible, as otherwise problems may occur with the busbar and heat dissipation.
It is recommended to install the servo amplifiers with decreasing power from left to right.
ƒ
A maximum of 8 servo amplifiers (max. 8 x 3 = 24 axes) can be connected to one supply unit.
ƒ
1
2
Fig. 2.1 Order of line-up
WARNING
Jetter AG
3
1) JM-3000 supply unit
2) JM-3000 servo amplifiers
3) additional JM-3000 servo
amplifier
RISK OF INJURY FROM HOT SURFACES
IGNORING THE INSTRUCTIONS COULD RESULT IN SERIOUS
BURNS OR DAMAGE TO MATERIAL.
ƒ During operation, the device can heat up to a temperature of up to
100 °C. Contact may cause skin burns. Therefore, provide protec-
tion against accidental contact.
ƒ In particular, ensure that there is sufficient clearance above the heat
sink to adjacent devices.
JetMove 3000 Supply Unit
19