Weekly Servicing (After Approximately 40 Hours Of Operation); Quarterly Servicing (After Approximately 500 Hours Of Operation) - Weber Geset 121 User Manual

Table of Contents

Advertisement

Chapter 9 Maintenance

Weekly servicing (after approximately 40 hours of operation)

Run.
Work to be arranged
No.
1
Motors:
Clean cooling webs.
Check bearing for noise.
Expert
2
Clean all guidings.
Expert
3
Dedust sensors with a smooth cloth or brush.
Electrician
4
*²Clean fan (switch cabinets etc.).
Electrician
5
*²Clean conveyor belts and chains.
Operating Personnel
6
*²Check adjustment of conveyor belts and chains.
Expert
7
*² Drain condensate at maintenance unit.
Operating Personnel
8
*²Clean operating screen.
Operating Personnel

Quarterly servicing (after approximately 500 hours of operation)

Run.
Work to be arranged
No.
1
Check the cable inlets of the end position switchs, initiator, plug-in
connector, terminal box and motors.
Electrician
2
Switch cabinet, terminal boxes:
Check guards for humming noise.
Visual inspection of the main power input and cable
connections.
Check wiring channel and protection against contact.
Check wiring information for completeness.
Clean cabinet housing inside and components with vacuum
cleaner.
Electrician
3
Check end position switch and initiators.
Electrician
4
Check display equipment and operator keys for function.
Electrician
*² Only if system has the appropriate features.
Version: 02.08.12
Page 58 of 71
32708732 Geset 121
Measurement
Test statistic
Lubricant
Contamination,
exceptional noises
Contamination
Function, contamination
Contamination
Contamination
Function
Drain condensate.
Contamination
Measurement
Test statistic
Lubricant
Wear
Function
Perceivable damages.
Outside contamination.
Function
Function