Chapter 6 Installation and initial startup

Setting up the labeling system

Requirements
The labeling system must be completely installed.
The labeling system is unpacked and prepared (see the chapter: "Transportation")
near the labeling site.
The connections for the compressed air and electricity are close to the labeling site
(maximum distance of 1.5 m) as specified in the chapter: "Specifications."
The base is solid, level and flat.
Required equipment
Wrench
Spirit level
Instruction
Set a labeling system up as follows
Step
1
2

Connecting the labeling station

The labeling station requires electricity and compressed air to work. For details see the
Chapter: "Specifications".
Version: 02.08.12
Procedure
Move the labeling system to installation site. Move labelers without rolls piece
by piece diagonally. Consider all points for "Placing the labeling system" on
page 33.
Adjust the labeling system with an air lever by the adjustable feet horizontally.
(With rolls, the brakes have to be locked).