Exchange Of Rollers - Weber Geset 121 User Manual

Table of Contents

Advertisement

Chapter 9 Maintenance
Requirements
 No transportation of products.
 Emergency stop push-button is unlocked.
 Labeling station is connected to power and *²compressed air.
 Labeling station was put into operation (see chapter „Adjustment of labeling
station and start-up").
Instruction
Please adjust the belt run as follows..
Step
1
2
3
4

Exchange of rollers

The durability of the drive rollers performed in the anti-friction bearings depend on load
and conveying speed.
It is normally sufficiently for an operating time of 4-5 years. After this time it is practical to
replace the bearings or rollers.
Version: 02.08.12
Procedure
Health hazard! Checking the belt run has to be arranged at running
system under load. Do not stick in, at or between moving parts.
Start transport belt.
Tension deflection roller at side slightly, to which the transport belt runs.
Transport belt should run some time.
Control belt run and correct it again if necessary.
Page 66 of 71
32708732 Geset 121

Advertisement

Table of Contents
loading

Table of Contents