1-Port - Panel Mount (Db9) Installation - Comtrol DeviceMaster PNIO 2000 Series User Manual

Table of Contents

Advertisement

Hardware Installation

1-Port - Panel Mount (DB9) Installation

10 - Hardware Installation
DeviceMaster or
Ports
DeviceMaster UP Model
DeviceMaster PNIO-2304
4
DB9 serial ports
DIN rail
DeviceMaster UP D
4
B9 serial ports
Panel mount
Use the following procedure to install the DeviceMaster 1-Port (panel mount).
1. Place the DeviceMaster 1-Port on a stable surface and skip to
optionally mount the DeviceMaster using the mounting flanges or DIN rail
adapters.
a. Pick up the DeviceMaster so that the front of the device is facing you.
b. Pick up a DIN rail clip. (The three tines should be on top
and the M4 label should face you.)
c.
Slide the DIN rail clip behind the DeviceMaster and line
it up with one of the screw holes on the DeviceMaster.
d. Insert the M4 screw into the hole and tighten with a
Phillips screwdriver.
e. Repeat
Steps b
Make sure the screws on both DIN rail clips line up.
Note: If you need to remove the DeviceMaster from the
DIN rail, exert pressure on the backside of the
tabs at the bottom of both DIN rail clips.
f.
Attach the DeviceMaster to the DIN rail.
Note: Do not connect multiple units until you have changed the default IP
address, see
Preparing the DeviceMaster for Configuration
2. Connect the DeviceMaster port labeled 10/100 ETHERNET to the same
Ethernet network segment as the PLC using a standard network cable.
3. Apply power to the DeviceMaster using the following procedure.
Note: See
1-Port Panel Mount 5-30VDC Power Supply
want to provide your own power supply.
PNIO-2304: 4-Port DIN Rail (DB9)
Installation
4-Port Panel Mount Installation
20
through d with the second DIN rail clip.
DeviceMaster
Front View
DeviceMaster PNIO | UP User Guide: 2000639 Rev. A
Installation Procedure
on Page 19
Step 2
M4
Side
Press here
on Page 23
on Page 149, if you
on Page
or
DIN Rail
Clip

Advertisement

Table of Contents
loading

Table of Contents