Introduction; Supported Models; Installation Overview - Comtrol DeviceMaster PNIO 2000 Series User Manual

Table of Contents

Advertisement

Supported Models

Installation Overview

DeviceMaster PNIO | UP User Guide: 2000639 Rev. A

Introduction

This User Guide supports the DeviceMaster Industrial Gateway, which includes
the following products:
DeviceMaster UP 1-port panel mount
DeviceMaster PNIO-2101and DeviceMaster PNIO-2201: 1-port DIN rail
models
DeviceMaster UP all 2-port DIN rail models: DeviceMaster PNIO-2xx2 series
Note: DeviceMaster UP 2-port models have been renamed.
Old Product Name
DeviceMaster UP 2-Port with 1 Ethernet port
DeviceMaster UP 2-Port with 2 Ethernet port
DeviceMaster UP 2-Port DB9 with 1 Ethernet port PNIO-2102
DeviceMaster UP 2-Port DB9 with 2 Ethernet ports PNIO-2302
DeviceMaster PNIO-2304: 4-port DIN rail
DeviceMaster UP 4-port panel mount
Note: DeviceMaster Industrial Gateway products (DeviceMaster UP and PNIO-
2000 series) are typically referred to as DeviceMaster in this User Guide.
This User Guide is organized to reflect the installation step order:
1. Install the hardware (Page 9).
2. Configure the IP address (Page 27).
3. If necessary, upload the latest firmware (Page 30).
4. Attach the serial device (Page 37).
5. Configure the serial port or ports (Page 53).
6. Configure the Ethernet device (Page 61).
7. Configure the DeviceMaster in TIA Portal (Page 69).
In addition, this User Guide also provides the following information:
IO data handling (Page 83)
Provides an example project (Page 89)
Advanced functions (Page 95)
Provides information about the DeviceMaster PNIO application web pages
(Page 103)
DeviceMaster Diagnostics web pages (Page 111)
DeviceMaster maintenance and Redboot procedures (Page 127)
New Model
Name
PNIO-2202
PNIO-2402
Introduction - 7

Advertisement

Table of Contents
loading

Table of Contents