Control Unit; Test Comfort - Kessel Pumpfix F Standard Instructions For Assembly, Operation And Maintenance

Control unit/electric components for kessel backwater pumping station for wastewater containing sewage
Table of Contents

Advertisement

6. Putting the Comfort unit into operation

6.1 Control unit

The control unit does not have to be
opened for initial operation.
The batteries included in the scope of sup-
ply are already connected and are activa-
ted the first time the unit is connected to
the 230V mains supply. Connect the
mains cable. The control unit carries out a
basic function test, the so-called initialisa-
tion. This is indicated by a running light ap-
prox. 8 sec. after the battery or the mains
cable has been inserted.
During the initialisation procedure, battery,
mains, probe, motor and pump connec-
tions are checked and the pump starts up
briefly. When the control unit has been
connected up correctly, the power LED
(green) lights up. The automatic backwa-
ter pumping station Pumpfix® F is now
ready for operation.
The backwater valve must be open follo-
wing initial operation. The functional test in
accordance with DIN EN 13564 and the
probe test must be carried out (see in-
structions for Pumpfix® F)

6.2 Test Comfort

Hold the motor probe into the water
2. Hold the pump probe into the water Pump starts
a
b
c
a) Control unit housing
b) Screwed sealing plug
c) Mains cable
d) Green LED "Power"
e) Red LED "Alarm"
f) Orange LED "Backwater"
g) Orange LED "Flap"
h) Orange LED "Pump"
Flap closes
Backwater-LED flashes
Flap-LED flashes
Flap closed
Backwater-LED flashes
Flap-LED lit
Pump-LED lit
9
d
m n o
l
i) Alarm key
j) Test key "Flap"
k) Test key "Pump"
l) Pump connection
m) Pump probe connection
n) Motor connection
o) Motor probe connection
e
i
f
g
j
h
k

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pumpfix f comfort

Table of Contents