Kessel Pumpfix F Standard Instructions For Assembly, Operation And Maintenance page 26

Control unit/electric components for kessel backwater pumping station for wastewater containing sewage
Table of Contents

Advertisement

Handover certificate (copy for the company carrying out the installation)
The initial operation and instruction was carried out in the presence of the person authorised to perform the ac-
J
ceptance and the system operator.
The system operator/person authorised to perform the acceptance was informed about the obligation to service the
J
product according to the enclosed operating instructions.
Initial operation and instruction were not carried out.
J
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and person
responsible for initial operation.
Place, date
Signature of person
authorised to perform acceptance
14. Handover-Ceritficate
Signature of system operator
26
Signature of the company
carrying out the installation work

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pumpfix f comfort

Table of Contents