INSTALLATION AND OPERATION
2.1
UNPACKING AND INSPECTION
Examine the shipping carton for damage prior to unpacking the equipment.
If the carton appears to be damaged, try to have the carrier's agent present when the
equipment is unpacked.
If this is not possible, retain all packaging material and
shipping containers for the carrier's inspection to verify damage to the equipment
after unpacking,
Also verify that the equipment shipped corresponds to the packing
slip.
Contact the Watkins-Johnson Company, CEI Division, or your Watkins-Johnson
representative for any discrepancies or shortages.
The unit was thoroughly inspected and factory adjusted for optimum
performance prior to shipment.
It is, therefore, ready for use upon receipt.
After
uncrating and checking contents against the packing slip, visually inspect all exterior
surfaces for dents and scratches. If external damage is visible, remove the dust covers
and inspect the internal components for apparent damage.
Then check the internal
cables for loose connections, and plug-in items such as printed wiring boards, which
may have been loosened from their receptacles.
2.2
PREPARATION FOR RESHIPMENT AND STORAGE
If the receiver must be prepared for reshipment, the packaging methods
should follow the pattern established in the original shipment.
If retained, the
original materials can be reused to a large extent or at least provide guidance for the
repackaging effort.
Conditions during storage and shipment should be limited as
follows:
Maximum humidity:
95% (no condensation)
Temperature range:
-30°C to 85°C
2.3
INSTALLATION
Rack mounting equipment, manufactured by Watkins-Johnson Company, is
designed for assembly in 19 inch racks in accordance with MIL-STD-189 or EIA
Standard No. RS-310. It is recommended that chassis slides be added to the racks for
ease of assembly, access to the unit, and to provide adequate for general installations.
Mobile installation of the equipment should be evaluated on an individual basis.
o
nhe re<leiver is designed for operational temperatures between 0° C and
50 C (32° F-122° F). Installation should provide for free-flowing air circulation
around and through ventilated units. Multiple stacking, in particular close adjacent
stacking of electronic equipment in a standard console, can produce an appreciable
increase in operating temperature for all equipment contained within the console.
Forced-air ventilation may be necessary to maintain proper air circulation and
temperature for efficient operation of the equipment.