The Loader appears again.
Note
When restarting the system, a project may already be loaded on the HMI device. The project
will then start after an configurable delay or when you press the "Start" button.
Use the relevant operating element to close the project.
Refer to your plant documentation to find any additional information on this topic.
Function test
Perform a function test following commissioning. The HMI device is fully functional when one
of the following states is indicated:
● The "Transfer" dialog is displayed.
● The Loader is displayed.
● A project is started.
Shutting down the HMI Device
Terminate the project at the HMI device before switching it off.
You have the following options for switching off the HMI device:
● Switch off the power supply.
● Remove the power supply terminal from the HMI device.
See also
Configuring the data channel (Page 113)
3.3.10

Securing the cables

After the power-on test, to ensure strain relief, use cable ties to secure the connected cables
to the marked fixing elements.
Comfort Panels
Operating Instructions, 03/2012, A5E03404994-02
Fasteners
Mounting and connecting the HMI device
3.3 Connecting the device