Download Print this page

Unpacking The Boiler - Rinnai aiM 65 M/S Manual

Advertisement

3.2.

Unpacking The Boiler

product just before installation. RINNAI is out of responsibilty due to damage or defects
emerging from inappropriate conditions of storage.
The packing material (plastics, foam, polystrene, nails, screws, bolts or staples/punches etc.)
aiM condensing boiler is attached as unable to shake or move on a wooden palette.
The aiM 65-85-115-
order as unpacked initially. Do not try to rise or levitate by your own!
Apply for help to at least one more person. It is advised to use an equipment like a lift in order to
rise and hang the boiler to a wall or a carrier structure. Follow the steps below to unpack and rise
the boiler.
Rev: RINNAI Service manual (English)
Date:14/05/2019
40

Advertisement

loading

This manual is also suitable for:

Aim 85 m/sAim 115 m/sAim 150 m/s