Mast Cylinder Disassembly; Mast Cylinder Installation - JLG TOUCAN 10E Service And Maintenance Manual

Hide thumbs Also See for TOUCAN 10E:
Table of Contents

Advertisement

The blockings must rest on turntable circular base
plate. Secure the blockings with C-clamps.
Figure 5-34. Supporting Mast Sections for Mast Cylinder
4. Using the ground controls, lower the mast until mast
section #2 bottom rests on blockings.
5. Remove one cotter pin from the mast cylinder
anchor pin. Drive the pin out using a suitable drift.
6. While controlling a mast lowering movement from
ground controls (or manual descent), manually help
the cylinder rod to retract (use a mallet if necessary).
Fully retract the rod.
31210090
Removal
SECTION 5 - TURNTABLE AND VERTICAL MAST
7. Once fully retracted, remove cylinder holding valve:
Refer to Section 7. Unhook the cylinder from its sup-
ports. Move the cylinder out of the mast.
Figure 5-35. Mast Cylinder Removal
NOTE: Care should be taken not to damage the Drive Orien-
tation Switch. Remove the switch if necessary, but do
not disconnect. Refer to Section 8-2.

Mast Cylinder Disassembly

Refer to Section 7.

Mast Cylinder Installation

1. Position the cylinder (fully retracted) onto the mast
assembly.
NOTE: Route the Drive Orientation Switch harness between
the two cylinder supports on turntable base plate.
2. Install cylinder holding valve: Refer to Section 7.
3. Using the ground controls, extend the cylinder until
the hole of the rod aligns with the mounting holes of
the mast section #2. Install the anchor pin and the
cotter pin.
4. Using the ground controls, fully extend the cylinder
and remove blockings.
5. From ground controls, perform a few mast raising/
lowering movements to bleed air from the circuit and
to check for proper operation.
6. Check hydraulic fluid level and adjust accordingly.
Install chassis shield and hoods.
– JLG Lift –
5-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents