Inspections
Every Three Months
Component
UPS
To optimize battery lifetime of the UPS it is recommended to fully discharge the battery
once every three months.
Annual
Component
Camera Cart
Monitor Cart
System
72
Inspection
• Discharge the battery by unplugging the mains power from the wall
outlet while the system is running.
• Wait until the system shuts down (max. five minutes).
• Plug in mains power and turn system on again.
• Repeat this process until the system shuts down immediately after
unplugging mains power and system emits a long beep followed by
short beeps. The battery is now empty.
• Fully charge battery by plugging in the system and switching on the
mains power switch for two or more hours.
Inspection
• Functional test of camera
• Functional test of camera handle
• Functional test of complete cart
• Check of mechanical support system (arm, wheels and locks)
• Functional test of device
• Check of mechanical support system (arm, wheels and locks)
• Electrical safety test (see page 41)