Appendix 1.
The procedures described in this appendix are applicable only when the CR-IR346RU is to
be relocated within the institution.
CAUTIONS
• The procedures described in this appendix should be used only for on-site relocation and not
for purposes of moving the machine out of the institution by use of a truck or the like.
• When the machine is to be moved out of the institution by use of a truck or the like, use
appropriate clamping materials to pack the machine and transport it under the same condition
as when it was originally shipped. If it were transported under different conditions than when
it was shipped, the machine would be damaged or its quality could not be guaranteed.
N NOTE N
The procedures described in this appendix are based on the assumption that RU software
version A07 or later (PC-MUTL software version 1.2 or later) is used.
I Workflow for On-Site Relocation
START
1. Preparation Prior to Relocation
1.1 Securing the Light-Collecting Mirror
1.2 Disconnecting the Cables
2. Relocating the Machine
3. Installation After Relocation
3.1 Connecting the Cables
3.2 Final Placement
3.3 Powering ON the CL/RU
3.4 Image/Conveyance Checks
3.5 Powering OFF the CL/RU
3.6 Cleaning the CL/RU
END
010-051-05
02.20.2002 FM3328
On-Site Relocation
CR-IR346RU Service Manual
FR6H7811.EPS
Appx IN-1-1
Appx IN-1-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-ir346ruCr-ir346cl

Table of Contents