A
8. Installing the Cover
9. CL Installation Procedures
10. Final Placement
10.1 Securing the Machine with the Adjustable Feet
10.2 Securing the Machine with the Retainers
10.3 Securing the Table and Machine Together
10.4 Securing the Machine with the Retainers and Table
11. Powering ON the CL/RU
12. Image/Conveyance Checks
12.1 Conveyance Checks
12.2 Image Checks
13. Powering OFF the CL/RU
14. Cleaning the CL/RU
15. Attaching the Cassette Handling Precaution Label
END
I Workflow for On-Site Relocation
When the CR-IR346RU is to be relocated within the institution, reference should be made to
"Appendix 1. On-Site Relocation."
010-051-05
02.20.2002 FM3328
CR-IR346RU Service Manual
CL Service Manual
"A. Installation/Chapters 3-7"
FR6H7005.EPS
IN - 5
IN - 5