Operation; Before Operating The Pump; Pump Operation Test - CME BodyGuard 575 Color Vision Operator's Manual

Pca infusion system, pain manager
Table of Contents

Advertisement

4 – Operation

Before Operating the Pump

Before attaching the system to a patient, run the following tests to verify that all
indicators and alarms work properly.
When an alarm is activated the following occurs:
An alarm message appears on the display
An audible alarm sounds
Infusion ceases
The LED changes from green to red
NOTE: All tests should be performed in the Continuous program.

Pump Operation Test

1.
Click the pump into a Charger connected to AC power. Verify that
the CHARGE indicator is on, red or green light (on charger).
2.
Insert a BodySet® administration set and close the door. Press the door until a
click is heard.
NOTE: For instructions on how to load and prime an administration set refer to
sections "Loading the Administration Set" & "Priming the Line".
3.
Press
to confirm.
4.
During the Self-Test a long beep will be heard. This procedure verifies that the
pump's acoustic and visual features are working properly. After self test is
completed, the display will show the last rate setting.
5.
Prime the set according to the priming instructions
following later in this manual.
6.
When priming is completed, wait 2 minutes
without pressing any key. After two minutes the
screen displays "Pump Paused Too Long" and an
alarm will sound. Press
again or
Software ver. CVPCA30E_1
until the Self-Test screen appears. If air sensor is off, press
to silence the alarm
to exit alarm condition.
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents