Ground Stacking Is10 - Adamson IS Series Rigging Manual

Line array
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

4.0 Rigging Procedures

4.6 Ground Stacking IS10

1. Remove all Quick Release L-Handles and the
2 Lifting Plates as well as the Rigging Links from
the IS10/IS119 Rigging Frame and place them in
a secure place for future use.
2. Designate 1 IS10 to be the top cabinet for your
stack. Remove the T45 Torx screws and rear
rigging links from the rear rigging piece of this
cabinet.
3. With the T45 Torx screws removed earlier,
attach the rigging links, lining up the X hole of
the rigging link to the hole of the Rigging Frame.
Torque setting of 6.5 Nm is to be used.
4. Lower the 4x Rigging Frame rigging links on
each corner of the Rigging Frame, removing and
loosening the T45 Torx screws as necessary.
Adamson Systems Engineering | IS-Series Rigging Manual
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents