4.0 Rigging Procedures
4.1 Suspending IS7
6. Affix the front of the enclosures together with
the T25 Torx screws (a) removed earlier. A torque
setting of 6.5 Nm is to be used.
7. With the rear rigging link still affixed to the
second enclosure via the X hole, swing the
rigging link (fig. 1) up until the appropriate holes
line up to achieve the desired rigging position.
Refer to the rigging legend displayed on each IS7
rear rigging piece (fig. 2). The rigging positions
listed on the legend refer to the rigging position
corresponding to the design in Blueprint. Make
sure that both left and right rear rigging is set to
the identical angle.
8. Repeat steps 5 through 7 until the desired
amount of enclosures are affixed in the array.
Adamson Systems Engineering | IS-Series Rigging Manual
a
fig. 2
fig. 1
Page 15