Rigging Procedures; Suspending Is7 - Adamson IS Series Rigging Manual

Line array
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

4.0 Rigging Procedures

4.1 Suspending IS7

1. Remove all links from the IS7/IS118 Rigging
Frame by removing the T25 Torx screws (a)
affixing them in place. Place the screws in a
secure place for future use.
2. Line up the IS7 enclosure front tab (b) so that
it will match to the bottom front hole (c) of the
Rigging Frame
3. Affix the IS7 enclosure through the front tab to
the bottom front hole of the frame using the T25
Torx screws (a) removed earlier. A torque setting
of 6.5 Nm is to be used.
Adamson Systems Engineering | IS-Series Rigging Manual
a
a
c
b
a
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents