Siemens NXPLUS C Installation And Operating Instructions Manual page 48

Medium-voltage switchgear, fixed-mounted circuit-breaker switchgear up to 24 kv, extendable, single busbar, metal-enclosed, gas-insulated
Table of Contents

Advertisement

Description
Installation possibilities for paper-insulated non-draining cables
Circuit-breaker panel 630 A, 1000 A ● Switch-disconnector panel 630 A ● Disconnector panel 1000 A ● Ring-main panel 630 A ● Vacuum
contactor panel ● Circuit-breaker panel 1250 A
Make
Conductor
cross-
2
section
2
[mm
]
1 cable per panel and phase
Nexans
35...300
EPDM
Euromold
nkt cables
25...120
Silicon
e
150...240
Silicon
e
2 cables per panel and phase
Nexans
35...300
EPDM
Euromold
nkt cables
25...120
Silicon
e
150...240
Silicon
e
3 cables per panel and phase
Nexans
35...300
EPDM
Euromold
1
At a continuous current of more than 1150 A, cable sealing ends with tin-plated, nickel-plated or silver-plated cable lugs are required.
2
Observe the actual current- and short-circuit-carrying capacity of the cables and sealing ends.
Installation possibilities for paper-insulated mass-impregnated cables
Circuit-breaker panel 630 A, 1000 A ● Switch-disconnector panel 630 A ● Disconnector panel 1000 A ● Ring-main panel 630 A ● Vacuum
contactor panel ● Circuit-breaker panel 1250 A
Make
Conductor
cross-
2
section
2
[mm
]
1 cable per panel and phase
nkt cables
25...120
Silicone 1x SÜEV10-120CU-
150...240
Silicone 1x SÜEV10-240CU-
2 cables per panel and phase
nkt cables
25...120
Silicone 1x SÜEV10-120CU-
150...240
Silicone 1x SÜEV10-240CU-
1
At a continuous current of more than 1150 A, cable sealing ends with tin-plated, nickel-plated or silver-plated cable lugs are required.
2
Observe the actual current- and short-circuit-carrying capacity of the cables and sealing ends.
48/293
1
● Disconnector panel 1250 A
Cable T-plugs
Coupling inserts/coupling
plugs
bolted
bolted
12 kV
12 kV
1x 430TB/G
1x SÜEV10-120CU-xxxx-
CB24
1x SÜEV10-240CU-xxxx-
CB24
1x 430TB/G
1x 300PB/G
1x SÜEV10-120CU-xxxx-
1x SÜEV10-120CU-xxxx-
CB24
CC24
1x SÜEV10-240CU-xxxx-
1x SÜEV10-240CU-xxxx-
CB24
CC24
1x 430TB/G
2x 300PB/G
1
● Disconnector panel 1250 A
Cable T-plugs
Coupling inserts/
coupling plugs
bolted
bolted
12 kV
12 kV
-
xxxx-CB24
-
xxxx-CB24
1x SÜEV10-120CU-
xxxx-CB24
xxxx-CC24
1x SÜEV10-240CU-
xxxx-CB24
xxxx-CC24
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • 802-9081.9
1
Distribution kit
for three-core
cables
1x distribution
-
kit MIND
-
-
-
-
2x distribution
kit MIND
-
-
3x distribution
kit MIND
1
Distribution kit
Surge arresters
for three-core
cables
-
CSA 12-x
-
CSA 12-x
-
CSA 12-x
-
CSA 12-x
Surge arresters
According to
standard
• GOST
additionally
(Russia, CIS)
• GB/DL (China)
300SA-5(10)SA
IEC, GOST, GB/DL
CSA 12-x
IEC, GOST, GB/DL
CSA 12-x
IEC, GOST, GB/DL
IEC, GOST, GB/DL
-
CSA 12-x
IEC, GOST, GB/DL
CSA 12-x
IEC, GOST, GB/DL
IEC, GOST, GB/DL
-
According to
standard
• GOST
(Russia, CIS)
• GB/DL (China)
IEC, GOST, GB/DL
IEC, GOST, GB/DL
IEC, GOST, GB/DL
IEC, GOST, GB/DL

Advertisement

Table of Contents
loading

Table of Contents