Installation
Wire routing
126/293
➭ Mount a supporting plate to stabilize the current transformers, and tighten the nuts.
➭ Lead the secondary leads from the instrument transformers into the low-voltage
compartment, and connect.
Fig. 86:
Cable routing into the low-voltage
compartment
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • 802-9081.9
①
Secondary leads
②
Vertical wiring duct
(only for secondary leads with
steel tube)
③
Cutout