Operation
7
➭
Remove the operating lever (the interrogation lever and the control
gate return to their initial position).
9
➭
Push the left-hand control gate to the left and hold it (the
interrogation lever locks in lower position. The left-hand actuating
opening for the DISCONNECTING function opens).
11
➭
Remove the operating lever (the interrogation lever and the control
gate return to their initial position).
1
Initial situation
3
➭
Push the right-hand control gate to the left and hold it (the
interrogation lever locks in lower position. The right-hand actuating
opening for the DISCONNECTING function opens).
258/293
Bus sectionalizer panel with two three-position disconnectors: Earthing the right-
hand busbar system
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • 802-9081.9
8
➭
Push the interrogation lever downwards again and hold it.
10
➭
Switch the left-hand three-position disconnector to OPEN position
(insert the operating lever and turn 180° counter-clockwise).
2
➭
Push the interrogation lever downwards and hold it.
4
➭
Switch the right-hand three-position disconnector to CLOSED position
(insert the operating lever and turn 180° clockwise).