Siemens NXPLUS C Installation And Operating Instructions Manual page 4

Medium-voltage switchgear, fixed-mounted circuit-breaker switchgear up to 24 kv, extendable, single busbar, metal-enclosed, gas-insulated
Table of Contents

Advertisement

15.14 Mounting the air guides ................................. 151
16
Electrical connections .................................... 154
16.2 Connecting cable T-plugs ............................... 158
connections ................................................... 163
16.4 Connecting surge arresters............................. 164
16.5 Connecting surge limiters .............................. 165
16.6 Connecting auxiliary circuits........................... 166
17
versions IP31D, IP32D and IP34D .................... 171
falling water drops......................................... 171
any direction.................................................. 176
18
Commissioning .............................................. 177
18.1 Final work...................................................... 177
18.2 Checking the accessories................................ 179
18.3 Instructing operating personnel ..................... 179
18.4 Function test / Test operation ......................... 179
voltage test.................................................... 183
18.6 Primary injection test ..................................... 184
18.7 Correcting circuit diagrams ............................ 184
18.8 Applying operating voltage ............................ 184
Operation........................................................ 186
19
Control elements and indicators..................... 187
19.1 Position indicators.......................................... 188
19.2 "Spring charged" indicator.............................. 188
19.3 Operations counter ........................................ 188
19.4 Ready-for-service indicator ............................. 189
20
Operating the circuit-breaker ......................... 190
20.1 Closing the circuit-breaker.............................. 190
20.2 Opening the circuit-breaker............................ 190
20.3 Charging the closing spring............................ 190
20.4 Circuit-breaker test operation ......................... 191
21
switch............................................................ 194
4/293
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • NXPLUS C • 802-9081.9
motor-operating mechanism.......................... 195
switch-fuse combination ................................ 195
(900 mm panel width) ................................... 196
22
Work-in-progress earthing.............................. 201
23
23.1 LRM plug-in sockets ....................................... 203
23.2 VOIS and CAPDIS indications .......................... 205
23.3 WEGA indications........................................... 207
24
Replacing HV HRC fuse-links ........................... 208
25
transformer ................................................... 212
26
Short instructions .......................................... 214
width) ........................................................... 214
width) ........................................................... 220
panel width ................................................... 230
(900 mm panel width) ................................... 234
panel width ................................................... 238
panel width ................................................... 242
width............................................................. 246
width............................................................. 253
earthing switch.............................................. 261
27
Cable testing.................................................. 266
Service information ........................................268
28
Maintenance.................................................. 268
30000 operating cycles .................................. 268
29
operating conditions ...................................... 275

Advertisement

Table of Contents
loading

Table of Contents