Switching Off The 2000 Platform; Resetting The 2000 Platform; First Start: Configuring Your Regional Settings - JDS Uniphase 2000 Platform User Manual

Handheld, modular platform designed for the construction, turn-up and maintenance of fttx networks
Table of Contents

Advertisement

Chapter 3 Starting up

First start: configuring your regional settings

Switching off
the 2000
Platform
Resetting the
2000 Platform

First start: configuring your regional settings

18
The JDSU logo appears on the screen briefly, then an autotest is
carried out.
The equipment is ready to be used once all the applications are
installed.
NOTE
It is possible to switch over from battery to mains operation, or vice
versa, without loss of data.
The module cannot be swapped when the unit is ON or AC
powered
In the event of an unexpected mains power cut, if there is no
battery, the current results and configuration will not be saved.
Next time the instrument is switched on, it will return to its initial
configuration.
While the 2000 Platform is operating, press the
it off.
NOTE
When the instrument is switched off using the
results and configuration are saved. Next time the
pressed, they are recalled.
If the 2000 Platform freezes, prolonged pressure (about 4 s.) on the
O
key will reset the instrument.
FF
Once the 2000 Platform is switched on, the first screen displayed allows
to configure the regional settings.
Those settings will be kept in memory and automatically applied on the
instrument each time it is restarted.
User Manual
790000002/00
O
/O
button to switch
N
FF
O
/O
button, current
N
FF
O
/O
key is
N
FF
O
/
N

Advertisement

Table of Contents
loading

Table of Contents