Table 2-4 Optional Cards For Terminal Board Tb3; Figure 2-3 Terminal Connections (Tb3) - Honeywell VPR100 User Manual

Table of Contents

Advertisement

ATTENTION
For CE Instruments:
The connection between protective earth ground (TB1 Pin1) and Earth Ground for the Communications
connection (TB2 Pin 6) is essential for CE compliance with Communications. This wire is installed at the
factory, be sure not to remove it.
6 AC Solid
State Relays
DO6 NO
DO5/6 C
DO5 NO
DO4 NO
DO3/4 C
DO3 NO
DO2 NO
DO1/2 C
DO1 NO
Note: Terminal label may contain options not installed on your instrument.
12/00
TB1
TB1
TB 2
TB2
*
L1
*
L2/N
+24V
-24V
AO1+
AO1-
8
AO2+
AO2-
AO3+
AO3-
AO4+
AO4-
*For 24VDC Input Power: L1=+; L2/N =

Figure 2-3 Terminal Connections (TB3)

Table 2-4 Optional Cards for Terminal Board TB3

Contents of cards
TB3
6 Mechanical
6 DC Solid
Relays (Form C)
State Relays
DO6 NC
DO6 NO
DO6 NO (-)
DO5/6 C
DO5/6 C (+)
DO5 NC
DO5 NO
DO5 NO (-)
DO4 NC
DO4 NO
DO4 NO (-)
DO3/4 C
DO3/4 C (+)
DO3 NC
DO3 NO
DO3 NO (-)
DO2 NC
DO2 NO
DO2 NO (-)
DO1/2 C
DO1/2 C (+)
DO1 NC
DO1 NO
DO1 NO (-)
VPR & VRX – User Manual
TB4
TB3A
TB3B
TX+
AI1 A+
TX-
AI1/2 B
CO M
AI2 A+
RX-
AI2 C-
RX+
AI3 A+
AI3 C-
AI3/4 B
8
AI4 A+
AI4 C-
AI5 A+
AI5 C-
AI5/6 B
TB3B only or
TB3A and TB3B
AI6 A+
See Table 2-5
AI6 C-
4 Mechanical
4 AC Solid
Relays/ 3
State Relays/
Event Input
3 Event Input
Relays
Relays
DI1
DI1
DI1/2 C
DI1/2 C
DI2
DI2
DI3 C
DI3 C
DI3
DI3
DO4 NC
DO4 NO
DO4 NO
DO3/4 C
DO3/4 C
DO3 NC
DO3 NO
DO3 NO
DO2 NC
DO2 NO
DO2 NO
DO1/2 C
DO1/2 C
DO1 NC
DO1 NO
DO1 NO
Installation
TB4
AI1 C-
4 DC Solid
State Relays/
3 Event Input
Relays
DI1
DI1/2 C
DI2
DI3 C
DI3
DO4 NO (-)
DO3/4 C (+)
DO3 NO (-)
DO2 NO (-)
DO1/2 C (+)
DO1 NO (-)
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrx100Vrx150

Table of Contents