Siemens SINAMICS S150 NEMA Operating Instructions Manual page 350

Converter cabinet units 15hp-1250hp
Hide thumbs Also See for SINAMICS S150 NEMA:
Table of Contents

Advertisement

Operation
6.8 Communication via PROFIBUS DP
6.8.2
Control via PROFIBUS
"COM (PROFIdrive)" diagnostics LED
The PROFIBUS diagnostics LED is located on the front of the Control Unit. Its meaning is
described in the following table.
Table 6- 28
Description of the "COM" LED
Color
Status
-----
Off
Green
Continuous light
Green
Flashing 0.5 Hz
Red
Flashing 0.5 Hz
Red
Flashing 2 Hz
Setting the PROFIBUS address
There are two ways to set the PROFIBUS address:
1. Via p0918
– To set the bus address for a PROFIBUS node using STARTER, first set the rotary
– Then use parameter p0918 to set the address to a value between 1 and 126.
2. Via the PROFIBUS address switches on the Control Unit
– The address is set manually to values between 1 and 126 using the rotary coding
Note
The rotary coding switches used to set the PROFIBUS address are located beneath the
cover.
348
Cyclic communication is not (yet) running.
Note:
The PROFIdrive is ready for communication when the Control Unit is ready for
operation (see LED RDY).
Cyclic communication is taking place.
Cyclic communication has not yet fully occured.
Possible causes:
- The controller is not transmitting any setpoints.
- In isochronous mode, the controller did not transmit a Global Control (GC) or it
transmitted an incorrect Global Control.
PROFIBUS master is sending incorrect parameter assignment/configuration data
Cyclic bus communication has been interrupted or could not be established.
code switches to 0
(00
dec
switches. In this case, p0918 is only used to read the address.
Description
) and 127
(7F
).
hex
dec
hex
Operating Instructions, 11/2017, A5E36652151A
Converter cabinet units

Advertisement

Table of Contents
loading

Table of Contents