Probe Connection To Logiq V2/Logiq V1; Probe Connector Locking Lever - GE LOGIQ V2 User Manual

Hide thumbs Also See for LOGIQ V2:
Table of Contents

Advertisement

Connecting the Probe (continued)
CAUTION
LOGIQ V2/LOGIQ V1
Direction 5610736-100 Rev. 9
3. Align the connector with the probe port and carefully push
into place with the cable facing the front of the system.
Figure 1-35. Probe connection to LOGIQ V2/LOGIQ V1
4. Flip the connector locking lever up.
Figure 1-36. Probe connector locking lever
5. Carefully position the probe cord so it is free to move and is
not resting on the floor.
6. When the probe is connected, it is automatically activated.
Make sure that the probe and application names displayed on
the screen correspond to the actual probe and application
selection.
User Guide
Probes
1-55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq v1

Table of Contents