Mounting The Hydraulic Manifold; Mounting Of The Steering Controller - Raven SBGuidance Onland Plough Installation Manual

Table of Contents

Advertisement

SBGuidance Onland Plough I Version 1.3 I CAN

2.3. Mounting the hydraulic manifold

For mounting purposes the manifold is
equipped with 3x M8 holes with internal thread.
Attach the manifold to the supplied manifold
bracket (Figure 10).
Place the manifold in such a way that the
hydraulic hoses from the manifold can be
easily directed towards the tractor and the
control cylinder. Ensure that the DIN
connectors on the valve can be connected after
fitting the manifold. Connect the control
cylinder to A and B of the manifold.
Load Sense
Connect the pressure line to P, the return line to
T and the sensor line to LS on the manifold.
Use the Load Sense (L.S.) connections of the
tractor.
Open Centre
Connect the pressure line to P and the return
line to T on the manifold. Use the external
hydraulics valve of the tractor.
The width cylinder of the plough can
also be manually steered by pressing
the pin on the proportional valve (Figure
11)

2.4. Mounting of the Steering Controller

The Steering Controller (STU – Onland Plough
Steering) can be mounted to the manifold with
the aid of an STU bracket (Figure 10).
It is recommended to mount the STU with the
connectors directed downwards, to prevent
water collecting on the connectors.
Figure 10 Manifold and steering controller installed
using the delivered brackets
Figure 11 Manual control hydraulic valve
SBG-Onland-Plough-IM-EN-V1.3 I Pag 17/39

Advertisement

Table of Contents
loading

Table of Contents