Epson C12 Series Manipulator Manual page 181

6-axis robots
Hide thumbs Also See for C12 Series:
Table of Contents

Advertisement

Installation: Joint #1 Timing belt (M/C Cable Downward)
1. Pass the cables and air tubes to the Joint #1 timing belt.
2. Mount the Joint #1 cable fixing plate.
Hexagon socket head cap bolts: 2-M3×6
Tightening torque: 2.0 ± 0.1 N·m
3. Mount the Joint #1 motor unit.
For details, refer to Maintenance: 5.1.1 Joint #1-Replacing the Motor (M/C Cable Backward),
Installation steps (1) to (4).
4. Disconnect the following parts from the hole inside the base to the
upper side of the base.
D-sub cable
Ground wire
RJ45 connector
F-sensor connector
5. Install the terminals of the D-sub cable ground wire and ground
wire (green/yellow).
D-sub cable ground wire terminals (×2) indicated by arrows
Ground wire (green/yellow) terminal (×1)
Cross recessed head screws with washer: 3-M4×8
Tightening torque: 0.9 ± 0.1 N·m
The installation positions of the D-sub cable ground terminals are
NOTE
fixed. Make sure to install them to the two screw holes on the
backside of the Manipulator (as indicated by arrows in the
photo).
C12 Rev.3
Maintenance 5. Joint #1
167

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C12-a1401 seriesC12xl

Table of Contents