3. Operation
8.
To change Rate 1 (1), select the box (2) next
to
to enter a specific value.
9.
Use the number pad to enter the down
pressure value.
10.
Select
.
11.
To change Rate 2 (3), select the box (4) next
to
to enter a specific value.
12.
Use the number pad to enter the down
pressure value.
13.
Select
.
14.
Select the one of the boxes (5) next to the
Bump Amount to change the interval the product rate will change
15.
To increase one of the product rates by the bump amount, select
16.
To decrease one of the product rates by the bump amount, select
17.
Select
to go back to the main screen.
3.22.5 Load the bins
Procedure
1.
Select Reload
(1).
Fig. 67
.
.
Fig. 68
100
GUID-7F60616C-255C-46D9-9910-0EFE8214331C-high.jpg [High]
GUID-67FA5A59-0F6B-4218-AC64-99F2C92B1A3B [V2]
GUID-0BDC505F-A7C8-4EF3-A929-411C0229E254-high.jpg [High]
Narrow-Transport Grain
Drill (322782B)