Solid Foundation - Acer e-mill 3VSII Operation Manual

Vertical turret w/ toshiba & fuji inverter
Table of Contents

Advertisement

4-2 Solid Foundation

When setting machine on a concrete foundation, it is advisable to use a little grout
(thin mortar) to take care of any unevenness in the concrete, as well as to provide a
solid foundation at all points.
When setting machine on a floor that has any surface irregularities , shims should be
used to correct this condition to the greatest extent possible .
See figure illustrated for installation layout.
e-mill 3VS & e-mill 3VSII
Figure 9. Installation layout
- 38 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-mill 3vkhE-mill 3vsE-mill 5vkE-mill 3vkE-mill 6vk

Table of Contents