NOTE
IT IS RECOMMENDED TH AT THE MACHINE BE
SECURED TO THE FLOOR TO PREVE NT MOVEMENT
OR TIPPING DUE TO OF F-CENTER LOADING.
Before securing machine to floor (i.e. tightening hold down bolts) make certain all
four corners are ma king contact with floor after machine is leveled.
If above
condition is not met, it is possible to twist the column and put a bind into the ways .
e-mill 3VK
Figure 10. Installation layout