Festo CPV-DI01 Manual page 22

Hide thumbs Also See for CPV-DI01:
Table of Contents

Advertisement

1. Installation
PROFIBUS-DP
Festo field bus
Fig. 1/4: Setting the field bus protocol with the 4-position DIL switch
1-8
1
2
4-position DIL switch:
1
Setting the field bus
protocol
2
Setting the extension
to the CP system
Fig. 1/3: DIL switch in the switch module (further informa-
tion on 1 ... 4 see following pages)
Setting the field bus protocol
The CPV Direct can be operated with one of four field bus
protocols. The desired protocol can be seleced with switch
elements 1 and 2 of the 4-position DIL switch.
Set the field bus protocol you wish to use as follows:
ABB CS31
8-position DIL switch:
3
Address selector switch
for station number
4
Setting the diagnostic
mode
1
SUCOnet K
Festo P.BE-CP-DI01-EN en 0007a
3
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv di01 series

Table of Contents