@ 17, 280 Loads Or Three Months; Rtd Series; 5760 Loads Or One Month; Loads Or 6 Months - Pro Mach Orion CTS Flex Stretchwrapper Manual

Stretch-wrapping equipment
Table of Contents

Advertisement

Orion
Revision 3.0
25 July 2016

RTD Series

RTA Series

@ 5760 Loads or one month

Inspect rubber stretch rollers. Clean as needed per instructions in manual.
Inspect belt condition. Adjust as needed.

@ 17, 280 Loads or three months.

Inspect tower drive chain. Apply a light coating of lubricant per instructions in man-
ual.
Inspect prestretch chain and belt. Tension as needed. Apply a light coating of lubricant
per instructions in manual.
Inspect the pneumatic hardware. Adjust as needed.

@ 34, 560 Loads or 6 months.

Lubricate ring bearing per instructions in manual.
Inspect carriage lift chain. Tension and lubricate per instructions in manual.
Inspect commutator assembly. Blow out debris per instructions in the manual.
5760 Loads or one month
Inspect rubber stretch rollers. Clean as needed per instructions in manual.
Inspect belt condition. Adjust as needed.
17, 280 Loads or three months.
Inspect tower drive chain. Apply a light coating of lubricant per instructions in man-
ual.
Check the cutter wire for excessive buildup. Replace if kinked or bent.
Inspect prestretch chain and belt. Tension as needed. Apply a light coating of lubricant
per Instructions in this manual.
Inspect the pneumatic hardware. Adjust as needed.
34, 560 Loads or 6 months.
Lubricate ring bearing per instructions in manual.
Inspect carriage lift chain. Tension and lubricate per instructions in manual.
Inspect commutator assembly. Blow out debris per instructions in this manual.
Machine Manual
CTS Flex Stretchwrapper
Maintenance
Page 5-9

Advertisement

Table of Contents
loading

Table of Contents