Preventative Maintenance Schedule; Pm Intervals; All H&L Standard Series; 5,760 Loads Or One Month - Pro Mach Orion CTS Flex Stretchwrapper Manual

Stretch-wrapping equipment
Table of Contents

Advertisement

Machine Manual
CTS Flex Stretchwrapper
Maintenance

Preventative Maintenance Schedule

All H&L Standard Series
Page 5-6

PM Intervals

PM Intervals are based on an average usage of a 16 hour production day.
FREQUENCY
12
96
192
5760
17,280
34,560
All general information about machine maintenance is based on normal machine working
conditions: indoor, moderate dust and low moisture environment, and maximum rotation
of 15 RPM. They should be regarded as guidelines, reviewed and corrected according to
requirements of actual use and conditions.

5,760 Loads or one month

Inspect rubber stretch rollers. Clean as needed per instructions in manual.
Inspect belt condition. Adjust as needed.

17,280 Loads or three months.

Inspect under turntable. Clean debris as needed.
Inspect turntable support casters for good condition.
Inspect turntable chain. Apply a light coating of lubricant per instructions in manual.
Inspect prestretch chain and belt. Tension as needed. Apply a light coating of lubricant
per instructions in manual.
Table 5-2. PM Frequency
PERIOD
LPH
LPS
LPD
LPM
LP3M
LP6M
Orion
Revision 3.0
25 July 2016
DESCRIPTION
(Hour)
(Shift)
(Day)
(Month)
(3Months)
(6Months)