Replacement Procedures
Front cover replacement
Read and follow
WARNING
Preparations
8-16
Energy Control and Power Lockout for Vivid E80/E90/E95.
When servicing parts of the Ultrasound system where there is
exposure to voltage greater than 30 volts:
1. Follow LOCK OUT/TAG OUT procedures.
2. Turn off the breaker.
3. Unplug the Ultrasound system.
4. Maintain control of the Ultrasound system power plug.
5. Wait for at least 30 seconds for capacitors to discharge as
there are no test points to verify isolation.
Ultrasound System components may be energized.
When preparing for the replacement, you must perform the
following steps:
1. Power down the Ultrasound system.
2. Disconnect the mains power cable from the wall outlet.
3. Disconnect all probes and external I/O cabling.
4. Remove the side covers.
5. Remove the top cover.
6. Remove the foot rest bumper.
–
Vivid E80/E90/E95
GC091052 Rev. 3
Service Manual