GE Vivid E80 Service Manual page 272

Hide thumbs Also See for Vivid E80:
Table of Contents

Advertisement

Replacement Procedures
Install the Wagon, A/N Drawer Sheet Met.
8-50
Follow these steps to install the Wagon, A/N Drawer Sheet Met.
1. Fasten the ground cable (Cable, GND, A/N Drawer) to the
Wagon, A/N Drawer Sheet Met. Assy by use of screw M4x6
/ washer tooth 4.3 (both sides of cable shoe), torque:
5,7 Nm.
2. Slide the Wagon, A/N Drawer Sheet Met. Assy into the
J-Rails w/Linings.
3. Place the J-Rails / Wagon into the tracks in UI Frame,
Lower.
4. Fix the J-Rails / Wagon to the UI Frame, Lower by using 6x
screw M4x8 and washer, flat 4.3mm (7), torque: 2,3 Nm.
5. Connect the grounding cable, Cable, GND, A/N Drawer to
the UI Mtg. Fork by use of nut M6 w/lock and washer tooth
6.4 between cable shoe and UI Mtg. Fork, torque: 5.7 Nm.
6. Install the A/N Keyboard.
Vivid E80/E90/E95
GC091052 Rev. 3
Service Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid e90Vivid e95

Table of Contents