GE Vivid E80 Service Manual page 88

Hide thumbs Also See for Vivid E80:
Table of Contents

Advertisement

System Setup
Table 3-5:
Step
Task
Fold down the assembled Exit Ramp.
11.
Unlock the Front Brakes on the Vivid
12.
E80/E90/E95, but keep direction lock
activated. The direction lock keeps
the front wheels in position, and
secures the direction stability when
the system is rolled down the ramp
from the pallet.
5.
Unlock the Rear Brakes.
Carefully move the Vivid E80/E90/
6.
E95 down the ramp, with rear end
first.
Assemble the empty transportation
7.
box and place all of the filling inside
the box before you close it.
Close the box, and store it for
possible future use.
3-14
Uncrating the Vivid E80/E90/E95 (Cont'd)
Illustration
1. Direction (Dir) Lock
2. Release Dir Lock and Front Brakes
3. Front Brakes
4. Rear Brakes
Vivid E80/E90/E95
Service Manual
GC091052 Rev. 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid e90Vivid e95

Table of Contents