Installation

The boiler room where the pellet heating is to be installed, has to fitt the local norms of fire
protection. Turn to your chimney-sweeper to approve your boiler and your chimney for
heating with pellets and to specify the place for device installation in a compliance with the
local norms of fire protection.
To get the building permission or another assent necessary for installation please, contact the
local building office and environmental comission.
It is needed to fitt the burner by screw males and females to the frame. The connexion
between burner and boiler has to be absolutelly tight to avoid the side air inlet or leak of
smoke.
The burner is set from the production in
burning the good quality pellets of
diameter of 6 mm and in heating output of
10 kW.
Inlet hose has to be lightly rounded and
both the ends have to be lightly moved
from each other.When the burner is
installed in the boiler, it has to be attached
with the connexion cable to appropriate
cable connector on the front side of the
boiler.
Connector
plug of the burner
Iwabo
To check the creation of condensate in flue
channel, the flue gas temperature to be
meassured in 1m below the top of the chimney. If
the flue gas temperature is below 60°C, the
condensate can be created. If the fluegas
temperature is a little below 60°C, installation of
the flap between the boiler and chimney is
sufficient to avoid the back drought. If the flue
gas temperature in 1m below the top of chimney
does not reach 55°C, a tube should be installed in
total length of chimney.
CAUTION :
!
The certificate of running into operation has to be filled up correctly and sent back to
the producer for further valid warranty.
Legend:
1. ATTACK PELLET BOILER
2. BOILER DOOR WITH GASKET
3. SCREW M8X50 -2 PCS
4. THERMAL INSULATION.
5. FLANGE OF BURNER "IWABO"
6. GASKET OF BURNER "IWABO"
7. BURNER "IWABO"
SCREWS OF BURNER "IWABO"
Female plug
After pellet feeder installation to the pellet storage it is
necessary to fill up the storage with pellets and then to
start the feeder by connecting it to the mains (see the
instructions for running in operation and use).