Assembly and installation of boiler

Installation of boiler
Only the person with valid approval for installation and assembly of the heat technology devices
can install the boiler. For installation it is necessary to elaborate a project in conformity with the
valid prescriptions. Technician must check, if information on data plate comply with project and
accompanying documentation, before doing the installation. Boiler must be connected in
conformity with valid prescriptions, norms, regulations and this manual. Manufacturer takes no
responsibility for damages caused by incorrect connection, eventually by incorrect operation.
Placing of boiler
Boiler is intended for installation and operation in premises with elementary environment
(AA5/AB5) under the STN 33 2000-3. By boiler installation it is necessary to keep safety distance
of its surface from flammable materials in dependence on the grade of flammability:
 from materials of flammability B, C1, C2
 from materials of flammability C3
 from materials, which grade of flammability
has not been approved under the STN 73 0853
Examples of division of constructive materials by the grade of flammability:
 grade of flammability A – inflammable (brick, block, ceramic tiles, mortar, plaster)
 grade of flammability B – very difficult to ignite (heraclith, lignos, boards from bazart felt)
 grade of flammability C1 – hard flammable (beech, oak, plywood, wersalit, hardened paper)
 grade of flammability C2 – medium flammable (pine, spruce chipboard, solodur)
 grade of flammability C3 – lightly flammable (boards from wood fibres, polyurethane, PVC,
foam rubber, polystyrene)
If boiler stands on the floor from flammable materials, it must be protected by inflammable heat
insulating pad, excessing boiler edge for 150 mm at least.
It is possible to use materials of the flammable grade A as inflammable and heat insulating
materials.
Any items from flammable materials cannot be placed on the boiler and in distance shorter than
500 mm.
When placing boiler in the boiler room, there should be free space left of at least 1 m beyond and
0,5 m from the sides and rear part of boiler. Above the boiler, there should be free space of at least
1 m. This space is necessary for ordinary operation, maintenance and eventual boiler servicing.
It is inadmissible to place the ATTACK PELLET 30 AUTOMATIC Plus boiler in dwelling
premises (including corridors)!
Air inlet
For correct boiler operation, it is necessary to ensure sufficient air supply for combustion. Minimum
area of the air inlet is 200 cm
Boiler connection into heating system
Installation and service of the ATTACK PELLET 30 AUTOMATIC Plus boiler can be performed
by trained service technician only. Before boiler installation into the older heating system, it is
necessary to flush the whole system to clean it. Heating system must be filled with water fulfilling
requirements of the STN 07 7401:1991 and its callosity cannot exceed 1 mmol/l and concentration
Ca
0,3 mmol/l. By unkeeping these conditions, warranty for boiler expires!
2+
2
.
200 mm
400 mm