How to install the pellet burner
The Iwabo Villa S2 must be installed by a skilled and trained professional.
Mounting frame
(A) of the burner is screwed from the boiler producer to the boiler.
Push the burner onto the screws of mounting frame and attach with thumb wheels (B).
Attach the drop tube to pellet feeder at required angle. Adjust the drop tube in such way that
it stays firmly in a place and tighten the locking screws.
Install the pellets storage bin and the pellet feeder. Between the feeder outlet and the drop
tube on the burner, the difference in high should be at least 500 mm. In lateral direction,
feeder outlet and drop tube should be at least 150mm (i.e. not verticaly aligned).
Fill the storage bin with pellets and connect the feeder to the mains (230V~). Now let the
pellet feeder run until even pellet feeding is obtained. A good idea is to tie the plastic bag to
feeder outlet to collect the falling pellets. Now install the feeding hose inbetween the feeder
outlet and drop tube and adjust the length of hose. The hose should neither be straight nor
sagging too much to prevent the pellets from building up and accumulating inside.
A
B
13
Outlet
Hose
Drop
tube